Deliver Second Hydrogen Recovery System and Ships Nitrogen Generators to Suzhou
In this July 2025, Kerong Gas delivered a second hydrogen gas recovery system to a steel annealing factory, following the customer’s satisfaction with the first unit installed three years ago. This repeat order reflects the reliability and performance of our technology. Additionally, two nitrogen gas generation systems are now en route to a semiconductor factory in Suzhou, further strengthening our presence in the high-tech manufacturing sector.
